How It Works
Every order follows the same path: brief, quotation, development, sample, approval, production, inspection and delivery. Each step ends with something you can check, a written quotation, a sample in your hands or photos of packed cartons, so you always know where your order stands.
- Start
- A brief by email or the quote form
- Quotation
- Written, in US dollars, euros or pounds sterling
- Sample
- 14 days after fabric and fit are agreed
- Approval
- In writing before bulk
- Production
- Date confirmed when fabric is booked
- Delivery
- Door to door worldwide
What are the steps of an activewear order?
Brief
You send styles, references, fabric wishes, colors, sizes, branding and rough quantities.
Quotation
We reply with questions and a written quotation with unit prices, minimums and terms.
Development
Patterns are made, fabrics chosen, colors matched and artwork prepared.
Sample
A finished sample is made in 14 days once fabric and fit are agreed.
Fitting
You fit the sample and send comments; we adjust and send the next round if needed.
Approval
You approve the final sample, colors and labels in writing.
Production
Bulk fabric is booked, then cutting, sewing, decoration and finishing.
Inspection
Every lot is measured and checked against the approved sample.
Delivery
Cartons ship with the documents your market needs.
What should a brief include?
- Styles
- What you want to make, with sketches, photos or a reference garment.
- Fabric
- The feel and performance you want, or a fabric you already like.
- Colors
- Color references, such as a swatch or a color code.
- Sizes
- Your size range and a size chart if you have one.
- Branding
- Logos, prints, labels, hang tags and packaging.
- Quantities
- Rough quantities per style and color.
- Dates
- When you need the goods in your warehouse.
What if you do not have a tech pack?
You do not need one to start. Many customers send photos, a sketch or a garment they like, and we build the specification with them. Our pattern makers take measurements from a reference garment or develop a pattern from your sketch, and we document fabric, colors, trims and labels as we go. By the time your sample is approved, the full specification exists and is stored for reorders. If a term such as grading or lab dip is new to you, our activewear glossary explains it in plain words.
If you do have a tech pack, it speeds up the quotation and the first sample. See our guide on writing an activewear tech pack.
What does the quotation include?
The written quotation states the unit price per style, the minimum per style and color, the fabric and decoration it is based on, the sample terms, the delivery term and the payment terms. If you want to compare options, such as two fabrics or two print methods, we price them side by side. Prices are quoted in US dollars, euros or pounds sterling.
How does sampling work?
Once fabric and fit are agreed, the first sample is made in 14 days and sent by express courier. You try it on your fit model, check the fabric, measurements, stretch, opacity and decoration, and send comments with photos. We adjust the pattern and make another round if needed. Most styles are approved after one or two rounds.
For team kits, a sample in the club design is made so colors, logos and fonts can be checked before the full roster is printed. Our guide on activewear sampling explains each round.
What is checked at each stage of production?
| Stage | What happens | What is checked |
|---|---|---|
| Fabric arrival | Bulk fabric is delivered from the mill | Color against standard, width, weight, faults |
| Cutting | Panels are cut from the approved pattern | Panel shapes and grain direction |
| Sewing | Panels are sewn with stretch stitches | Seam strength, stitch density, stretch of seams |
| Decoration | Printing, embroidery or heat transfers | Position, color, adhesion |
| Finishing | Trimming, labels, pressing | Labels, care information, appearance |
| Final inspection | Pieces are measured and inspected | Measurements against the approved sample |
| Packing | Folding, bagging and cartons | Quantities per size and color, carton labels |
How do you know where your order is?
We send updates at each stage: fabric booked, cutting started, sewing, decoration, final inspection and packing, with photos where useful. If anything changes, such as a fabric delay, you hear about it as soon as we know, along with the options. Before shipping, you receive the packing list and photos of packed goods.
How are orders shipped?
Small orders and samples go by express courier. Larger orders go by road to Europe and the UK, or by air or sea to other regions. The delivery term in your quotation states who pays for freight, clearance, duty and taxes. EU shipments travel with an A.TR certificate and UK shipments with proof of origin, so duty is zero when the rules are met, while VAT applies at import. See shipping and payment for details.
How do reorders work?
Reorders are the simple part. Every approved style is stored with its pattern, measurements, fabric, color standard, trims, decoration and labels. You send the style reference and the new quantities, we confirm the price and date in writing, and production starts as soon as fabric is booked. No new sample is needed unless you change something.
How long does the whole process take?
The sample takes 14 days once fabric and fit are agreed, plus courier time. Fitting rounds depend on how quickly comments come back. Production time is confirmed in writing when bulk fabric is booked, because it depends on the fabric, the quantity and the decoration. Transit then depends on where you are. Our guide on production lead time helps you plan a launch backward from your date.
What makes our process work for growing brands?
Clear steps, written approvals and stored specifications mean nothing depends on memory or guesswork. A label can launch with a few styles, add new ones each season and reorder its best sellers with a short email. Teams get the same kit every season. That steadiness, built on a sample first approach and a supply chain close at hand in Istanbul, is what keeps our customers producing with us.
How are colors matched during development?
Fabric colors are matched with lab dips: small pieces of fabric dyed to your color reference and sent for approval. Printed designs are matched with strike offs, printed samples of your artwork on the chosen fabric. Once you approve a lab dip or strike off, it becomes the color standard for bulk and for every reorder. Colors are best judged in daylight, side by side with the reference.
How are sizes graded?
Once the base size fits, the pattern is graded to the other sizes using your size chart or a standard chart for your market. Grading for stretch garments needs care, because a small change in the pattern changes the fit and the compression. We can make a size set, one sample in each size, before bulk if you want to check the whole range. See our guide on size charts and grading.
What are the payment steps?
Payment terms are agreed with the quotation and confirmed in writing. The usual pattern is a deposit to book fabric and start production, and the balance before shipment, by bank transfer in US dollars, euros or pounds sterling. Sample terms are stated in the quotation.
What happens if something goes wrong?
Problems are handled early and in the open. If a fabric lot is late or does not match the standard, we tell you at once, with the options and their effect on the date. If an inspection finds pieces that do not match the approved sample, they are corrected or remade before shipping. If an issue is found after delivery, you send photos and details, and we agree a fair solution in writing.
What do people ask about the process?
Do I need a tech pack to start?
No. Photos, a sketch or a reference garment are enough.
How many sample rounds are normal?
Most styles are approved after one or two rounds.
Can I change something after approval?
Yes, before bulk fabric is booked. Later changes may affect price and date.
Do you send production photos?
Yes, at key stages and before shipping.
Can a third party inspect the order?
Yes. We schedule their visit before shipping.
Do reorders need a new sample?
No, unless you change the style.
Can several people approve?
Yes. Add everyone who should be copied on emails.
Can you make a full size set before bulk?
Yes. One sample in each size can be made to check grading.
How are colors approved?
With lab dips for fabric and strike offs for prints, approved in writing.
Which guides help you prepare an order?
Tell us what your range needs
A few lines are enough to start. Attach a tech pack, sketches or photos of a garment you want to improve on if you have them.
- We reply by email with questions or a written quotation.
- Your first sample is cut and sewn in 14 days once fabric and fit are agreed.
- Bulk fabric is cut only after you approve that sample on a body.